CHECKOFF SHEET MS-2014-02661_0001.tif i
i
09- 24 -'14 11;91 FROM- Absolute Customs T -151 P0091I0004 F -066
i
2009 INTERNATIONAL RESIDENTIAL
CITY OF BEAD REROOFINO CKCKOFF SHEET
Return to Blair GRY dull prior to Mat inspection :
218 S 'l a Street, Blair, NE 68008
Deea.use of (imitations caused by the infeasibility to perform dat: *sled inapecVions whioil would
interfere with reroofing worts, please Indicate compliance Mt h the following requirenlentO
Lollowing this reroofing job.
Permit #-
Installation Date.
YES lea
The materials and methods of application used for recovigring or repladng the existing
roof covering comply with the requirements of the building code. (1:907.1)
l iw P11,0TirGTtom IN LLED•. An lea harrier thatconsiste of at least WO layers Of
underlsyment or of a self-adhering polymer modi€'ied bitumen sheet was [nstalled and
extends at least fro the cave's ed a to a point t leas the exterior
t 2fi (riche ' side
wall lime of the building. (11905.2.71)
I STR1lD•l'LiRAL S()MpONEN - F AIDE 5[�Llt�ll�' Xhe structutai roof components arc
capable of supporting the roof covering system etnd the material and equipment loads
that will be encountered during Installation of the roof covering system. (R907.2)
[ E?tlS'l ijCIVE lNG WAS Rr:MoVeD. Existing roof ocvering was removed for one
of the reasons required by section 8007.3
No RIJSTE13 iy[ BAR OR FLASHING Existing vent flashing, metal edges, drain
otlttets, collars or metal counter-flashing were not reinstalled if rusted. (R907.6)
I (� F LA IiIN aPl*F3LY° Flashing shall be reconsfru�cYed 1n accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bituminous materials are to be adhered shell be primed prior to installation. (8907.6)
�I
nature of primary installer f Dot
1�
Signature of ermit Molder
17a%
` 1