Loading...
CHECKOFF SHEET MS-2014-02661_0001.tif i i 09- 24 -'14 11;91 FROM- Absolute Customs T -151 P0091I0004 F -066 i 2009 INTERNATIONAL RESIDENTIAL CITY OF BEAD REROOFINO CKCKOFF SHEET Return to Blair GRY dull prior to Mat inspection : 218 S 'l a Street, Blair, NE 68008 Deea.use of (imitations caused by the infeasibility to perform dat: *sled inapecVions whioil would interfere with reroofing worts, please Indicate compliance Mt h the following requirenlentO Lollowing this reroofing job. Permit #- Installation Date. YES lea The materials and methods of application used for recovigring or repladng the existing roof covering comply with the requirements of the building code. (1:907.1) l iw P11,0TirGTtom IN LLED•. An lea harrier thatconsiste of at least WO layers Of underlsyment or of a self-adhering polymer modi€'ied bitumen sheet was [nstalled and extends at least fro the cave's ed a to a point t leas the exterior t 2fi (riche ' side wall lime of the building. (11905.2.71) I STR1lD•l'LiRAL S()MpONEN - F AIDE 5[�Llt�ll�' Xhe structutai roof components arc capable of supporting the roof covering system etnd the material and equipment loads that will be encountered during Installation of the roof covering system. (R907.2) [ E?tlS'l ijCIVE lNG WAS Rr:MoVeD. Existing roof ocvering was removed for one of the reasons required by section 8007.3 No RIJSTE13 iy[ BAR OR FLASHING Existing vent flashing, metal edges, drain otlttets, collars or metal counter-flashing were not reinstalled if rusted. (R907.6) I (� F LA IiIN aPl*F3LY° Flashing shall be reconsfru�cYed 1n accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shell be primed prior to installation. (8907.6) �I nature of primary installer f Dot 1� Signature of ermit Molder 17a% ` 1