Loading...
CHECKOFF SHEET MS-2014-02457_0001.tif 09- 19 -`14 13;55 FROM- Absolute Customs T -141 P0007/0010 F -054 2009 INTERNATIONAL ESQ TIC, CODE CITY OF B LAIR REROOFING CHECKOFF SHEEN' R eturn to Blair City Hall prior to Final inspection 218 8 16'' Street, Blair, NE 68008 i3ecause. of limitations paused by the infeasibility to perform ,detailed inspections which would not interfere with reroofing work, please indicate compliance W ith the fallowing raquirernents LOLOwIng this reroofing job. � Permit 0: L5 rl Installation Dates YES No The materials and methods of application used for recovering or replacing the existing j r oof covering comply with the requirements of the building cone. (R907.1) ICE PRO Iii§ ALLEQ. An ice barrier thatconsists of at least two layers of underlayment or of a self polymer mcdlfiad bitumen sheet was ristalle and extends at least from the eay :'s eda to a point at least 24 inch e 'side the exterior wall line of the building. (8905.2.7.1 3 UCTUPAL CO The structural roof components are capable of supporting the roof covering system andthe material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasone required by section R907,3 Nib a usTma 5- Acting vent flashing, metal edges, drain outlets, cellars or metal coun t er -flashing were not reinstalled if rusted. (11907.5) ® Fi_A5H1 O IN ST D l? OPE LY: leashing shall be reconstructed in accordance vvith approved manufacturer's Installaflon instructions. Metal flashing to which bituminous materials are to be adliered shall be 1primed prior to installation. (R007,6) 4 rin at bui rr L ie - of Primary Installer ass r mit Holder Rate I