CHECKOFF SHEET MS-2014-02457_0001.tif 09- 19 -`14 13;55 FROM- Absolute Customs T -141 P0007/0010 F -054
2009 INTERNATIONAL ESQ TIC, CODE
CITY OF B LAIR REROOFING CHECKOFF SHEEN'
R eturn to Blair City Hall prior to Final inspection
218 8 16'' Street, Blair, NE 68008
i3ecause. of limitations paused by the infeasibility to perform ,detailed inspections which would
not interfere with reroofing work, please indicate compliance W ith the fallowing raquirernents
LOLOwIng this reroofing job. �
Permit 0: L5 rl
Installation Dates
YES No
The materials and methods of application used for recovering or replacing the existing j
r oof covering comply with the requirements of the building cone. (R907.1)
ICE PRO Iii§ ALLEQ. An ice barrier thatconsists of at least two layers of
underlayment or of a self polymer mcdlfiad bitumen sheet was ristalle and
extends at least from the eay :'s eda to a point at least 24 inch e 'side the exterior
wall line of the building. (8905.2.7.1
3 UCTUPAL CO The structural roof components are
capable of supporting the roof covering system andthe material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasone required by section R907,3
Nib a usTma 5- Acting vent flashing, metal edges, drain
outlets, cellars or metal coun t er -flashing were not reinstalled if rusted. (11907.5)
® Fi_A5H1 O IN ST D l? OPE LY: leashing shall be reconstructed in accordance
vvith approved manufacturer's Installaflon instructions. Metal flashing to which
bituminous materials are to be adliered shall be 1primed prior to installation. (R007,6)
4 rin at bui rr L ie - of Primary Installer ass
r mit Holder Rate
I