CHECKOFF SHEET MS-2014-01998_0001.tif 09- 22 -'14 14;41 FROM- Absolute Customs T -144 P0011/0014 F -058
MIL
2009 I NTERNA TI ONAL R o
SHEE
CITY OF BLA IR REROOFING CHECKOFF
Return to i lak City Hail PrIo» to Mal onspection
218 3 1 e s troGt, Bich, NE 6 8008
l3eoause o f limitations caused by the infeasibility to perform Ol allod inspections which would
no t' nteilare with reroofing worn, please indicate COMP1<iareee +Ath the following requiramar►ts
follow'sna this raroofing,1011°
Permit 0: f v k<
Installation Date-,
Yea No
' The materials and methods Of aPplicatiol) used for recovering cr replacing the exist
roof covering comply with the requir0l'nents of the building code. (R907.1)
ICE p" ST
gyFeT 1 ALLED. An ice barrier thatoonsists of at least two layers cf
underlayment or of a self- adhering polymer modffisd bitumen sheet was installed and
extends tie st fro the a va's ed a to a point at lja N - nc a i s d :thee Brier
well line of the building. (R$0D,Z. I A)
8°f RII0TURA_ L C0M_P0 F M . _ SOU N13.. The structural roof components are
capable of supporting the roof covering system andthe material and equipment loads
4 that wi11 be encountered during installation of the ro f oovering system. (RQ07.2)
{ EXISTING O ER WAS ���1 � Exiatingraaf covering was removed for one
of the reasons required by sectlon 11907
C7: U TIr !..1�i A C71 Pl-+� lll�l n l xisting vefttilashing, metal edges, drain
cutlets, oollars, or metal counter-flashing weed not {einstalled if rusted. (11907.5)
fi Lch Il\l INS �ALLg PR t'E lie'° Flashing s hall ba rcGona�ruc @ed in accordan
with approved manufacturer's installa #ion Instructians. Metal flashing to which {
bitunflnous materials are to be adhered shall he primed prior to installation. (8907.6) I
Date
I at of Primma► lns1 11er
Signature
Date
of erMit Holder