Loading...
CHECKOFF SHEET MS-2014-01998_0001.tif 09- 22 -'14 14;41 FROM- Absolute Customs T -144 P0011/0014 F -058 MIL 2009 I NTERNA TI ONAL R o SHEE CITY OF BLA IR REROOFING CHECKOFF Return to i lak City Hail PrIo» to Mal onspection 218 3 1 e s troGt, Bich, NE 6 8008 l3eoause o f limitations caused by the infeasibility to perform Ol allod inspections which would no t' nteilare with reroofing worn, please indicate COMP1<iareee +Ath the following requiramar►ts follow'sna this raroofing,1011° Permit 0: f v k< Installation Date-, Yea No ' The materials and methods Of aPplicatiol) used for recovering cr replacing the exist roof covering comply with the requir0l'nents of the building code. (R907.1) ICE p" ST gyFeT 1 ALLED. An ice barrier thatoonsists of at least two layers cf underlayment or of a self- adhering polymer modffisd bitumen sheet was installed and extends tie st fro the a va's ed a to a point at lja N - nc a i s d :thee Brier well line of the building. (R$0D,Z. I A) 8°f RII0TURA_ L C0M_P0 F M . _ SOU N13.. The structural roof components are capable of supporting the roof covering system andthe material and equipment loads 4 that wi11 be encountered during installation of the ro f oovering system. (RQ07.2) { EXISTING O ER WAS ���1 � Exiatingraaf covering was removed for one of the reasons required by sectlon 11907 C7: U TIr !..1�i A C71 Pl-+� lll�l n l xisting vefttilashing, metal edges, drain cutlets, oollars, or metal counter-flashing weed not {einstalled if rusted. (11907.5) fi Lch Il\l INS �ALLg PR t'E lie'° Flashing s hall ba rcGona�ruc @ed in accordan with approved manufacturer's installa #ion Instructians. Metal flashing to which { bitunflnous materials are to be adhered shall he primed prior to installation. (8907.6) I Date I at of Primma► lns1 11er Signature Date of erMit Holder