Loading...
CHECKOFF SHEET MS-2014-01996_0001.tif 09-19-'14 13:54 FROM- Absolute Customs T -141 P0001/0010 F -054 2009 IN TERNATIONAL MENTI COQ CITY O BEAD. REROOFING CHECKOFF SHEEN" Return to t airs icy Hall prior to Final Inspection 218 16th treat, Blair, ME 68008 Because of limitations caused by the Infeasibility to performs detailed inspeollons Which w ould not interfere with reroofing work, please indicate oompliance with the following requiirerrsents following this reroofing job. Permit#: Installation Date. � � YES No The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (119071) iCl; PROT15 lid ALLISQ: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified Yltumen sheet was insta lled and extends at le st f rom the eave's ed a to a point at least 24 'nc inside the eAerior wall line of the building. (R905.2.7.'i) TRUCTUI Ai, - ,oMp D JENTS ARd= SOL!t4 , "the structural root components are capable of supporting the roof covering system and the material and equipment toads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING '1frlAS REMOVED, Existing roof oovering was removed for one of the reasons required by section 8907,3 MO RUSTED McTAL QR l LA•SHINO s Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) Fl,A_SHJ1NQ 114 STALLED I' L OPE , LY: Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be ptirned prior to installation. (11907.9) al ; ture of Primary Installer Gate ell Date s , aturo of arm Holder i I