CHECKOFF SHEET MS-2014-01995_0001.tif 09- 19 -'14 13,55 FROM- Absolute Customs T -141 P0003/0010 F -054
I
2009 INTERNAT RES MENTIAL
CITY OF BEAD. REROOFING CHECKOFF SH EET
Return to Blair Clay Mall prior to Firal inspection
218 8 16 S treet, Blain, NE 63008
I
Because of limitations caused by the Infeasibility to performs dj;Wled inspections which would
o interfere with reroofing work, please Indicate compliance All the following requii'omOnts
following this reroofing job.
Permit 0:
Installation Date: 1 �
YE$ NO
The materials and methods of application used for revering or replacing the existing
roof covering comply with the requirements of the building code, (11907.11)
ICE PPO'_rEOTiON INSTALL C]; An lee barrier that consists of at least tWo layers of
underlaymer+t or of a self-adhaCtng polymer modified biturnen sheet was installed_ and
extends at feast tr m the eave's ed to a point ax leash ino s inside the e)derior
wall line of the building. (R905,2.7.1)
_ I
( s'ii'l�IJO'i'I,IRAi_ QQM ONEI S Al SOUND, The structural roof components are
capable of supporting fhe roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering systern. (8907.2)
EXHTIh1G OOVI Ii'�10 11ifAS _REMOVED: Ex €sting roof covering was removed for one
of the reasons required by section R007.3
No USTE!L) METAIL OR F Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5)
[ LA$ 1111 114STALLED PROP RLY; Flashing shall be reconstructad In accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (11907.6) i
V_ 1
iL
q
Si ature of Primary Installer Dat
" A
Le
Ipgnature of ermit Molder plate
I
i