Loading...
CHECKOFF SHEET MS-2014-01995_0001.tif 09- 19 -'14 13,55 FROM- Absolute Customs T -141 P0003/0010 F -054 I 2009 INTERNAT RES MENTIAL CITY OF BEAD. REROOFING CHECKOFF SH EET Return to Blair Clay Mall prior to Firal inspection 218 8 16 S treet, Blain, NE 63008 I Because of limitations caused by the Infeasibility to performs dj;Wled inspections which would o interfere with reroofing work, please Indicate compliance All the following requii'omOnts following this reroofing job. Permit 0: Installation Date: 1 � YE$ NO The materials and methods of application used for revering or replacing the existing roof covering comply with the requirements of the building code, (11907.11) ICE PPO'_rEOTiON INSTALL C]; An lee barrier that consists of at least tWo layers of underlaymer+t or of a self-adhaCtng polymer modified biturnen sheet was installed_ and extends at feast tr m the eave's ed to a point ax leash ino s inside the e)derior wall line of the building. (R905,2.7.1) _ I ( s'ii'l�IJO'i'I,IRAi_ QQM ONEI S Al SOUND, The structural roof components are capable of supporting fhe roof covering system and the material and equipment loads that will be encountered during installation of the roof covering systern. (8907.2) EXHTIh1G OOVI Ii'�10 11ifAS _REMOVED: Ex €sting roof covering was removed for one of the reasons required by section R007.3 No USTE!L) METAIL OR F Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) [ LA$ 1111 114STALLED PROP RLY; Flashing shall be reconstructad In accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) i V_ 1 iL q Si ature of Primary Installer Dat " A Le Ipgnature of ermit Molder plate I i