Loading...
CHECKOFF SHEET MS-2014-01994_0001.tif I 09- 19 -'14 13;55 FROM - Absolute Customs T -141 P0004/0010 F -054 2009 INTER NATIONAL T I A►L CODE CITY O F BLAIR REROOFING CHECKOFF SHEET Return to Blair City ball prior to Final llnspection : 218 8 16th Street, Blair, NE 608008 Because of limitations caused by the Infeasibility to perform datolled inspection$ which would not interfere with reroofing work, please Indicate compliance with the following requirements fa ll Ing this foroofIng job. Permit 4: Installation Date: _ YQS No 'V Cl The materials and methods of application used for recovering or replacing the existing roof cavering comply with the requirements of the building cod& (R9 C PRoTI_cTiom l sTALLrzO: An fee barrier thatcorhsists of at least two layers Of underlayment or of a self-a polymer modffied bitumen sheet +Nos inetallad and extends Ieast fCO the 'av0'S ed a to a point at least 24 inches inside the exterior thrall line of the building. (8905.2.7.1) STRUCTURAL QlAROMEN s ARE t]l,lND- The structural roof components are capably of supporting the roof covering systern and the material and equipment loads that will be encountered during installation of the roof covaring system. (8907.2) ® EXISTING COVE ING W S REM OV9o. Existing roof covering was removed for one of the reasons required by section 8907.3 No USTEI) Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing wero not reinstalled if rusted. (R907.5) .SHING IMSTALLED I.ROPERL.Y. Flashing shall be reconstructed in accordance with approved martufaoturees. installation insfructlons. metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) j au � et� 5r ature of Da Primary installer ate Signature of wmit Holder i