Loading...
CHECKOFF SHEET MS-2014-01993_0001.tif i 09- 19 -'14 13;55 FROM - Absolute Customs T -141 P0006/0010 F -054 2009 INTERNATIONAL RESIDENTIAL COQ CITY OF BLAIR REROOFING CHECKOFF S HEET Return to Blair City Hall prior to FWRI Inspection 218 16 treet ; 13lai>r l NE 6 008 Because of limitations caused by the infeasibility to perform d ®tailed inspeetions which would Mt interfere with reroofing work, please indicate eo mplianooMth the following requireMGnt$ following this reroofing job. Permit #.. ��`"L" V073 �d 4— i Installation Date. �`° `a\ �1C -C 1 9 1QC i � y YES No The materials and methods of application used for recovering of replacing the existing roof covering comply with the requirements of the building code. (119071) lcl; pRo rFeTION INSTALLED: An ice Farrier thatoonsists of at least two layers of underlayment or of a self adhetfng polymer modifled bitumen sheet was inatalied and extends t ►.east fr m the eave's edc1_8 to a point at least 24 inc es inside the exterior wall line of the building. (R9O5.2.7.1) sTRup-'uLAL CUMPIrtNi"NTS ARE SOUNI The structural roof components are eapable of supporting the roof covering system andthe material and equipment loads that will be encountered during installation of the roof covering systern. (R907.2) EXISTING DOVE ING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 1;,907.3 No USTED ME`( � QR ELAi_I•-il G: �xisfil�+� vent flashing, metal edges, drain outlets, collars or metal oounter- flashing were not reinstalled if rusted. (11907,5) ® Fl_,� H1111Ca Ifi1 T iLLEI F'R PERLY: f=lashing shall be reconskruoted in accordance with approved manufacturer's installation instructions. metal flashing is which bituminous materials are to be adhered shall be primed prior to installation. (8907.0) i T I S1 ature of Primary Installer ate Signature of atmit Holder to L i