CHECKOFF SHEET MS-2014-01993_0001.tif i
09- 19 -'14 13;55 FROM - Absolute Customs T -141 P0006/0010 F -054
2009 INTERNATIONAL RESIDENTIAL COQ
CITY OF BLAIR REROOFING CHECKOFF S HEET
Return to Blair City Hall prior to FWRI Inspection
218 16 treet ; 13lai>r l NE 6 008
Because of limitations caused by the infeasibility to perform d ®tailed inspeetions which would
Mt interfere with reroofing work, please indicate eo mplianooMth the following requireMGnt$
following this reroofing job.
Permit #.. ��`"L" V073 �d 4—
i
Installation Date. �`° `a\ �1C -C 1 9 1QC
i
� y
YES No
The materials and methods of application used for recovering of replacing the existing
roof covering comply with the requirements of the building code. (119071)
lcl; pRo rFeTION INSTALLED: An ice Farrier thatoonsists of at least two layers of
underlayment or of a self adhetfng polymer modifled bitumen sheet was inatalied and
extends t ►.east fr m the eave's edc1_8 to a point at least 24 inc es inside the exterior
wall line of the building. (R9O5.2.7.1)
sTRup-'uLAL CUMPIrtNi"NTS ARE SOUNI The structural roof components are
eapable of supporting the roof covering system andthe material and equipment loads
that will be encountered during installation of the roof covering systern. (R907.2)
EXISTING DOVE ING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 1;,907.3
No USTED ME`( � QR ELAi_I•-il G: �xisfil�+� vent flashing, metal edges, drain
outlets, collars or metal oounter- flashing were not reinstalled if rusted. (11907,5)
® Fl_,� H1111Ca Ifi1 T iLLEI F'R PERLY: f=lashing shall be reconskruoted in accordance
with approved manufacturer's installation instructions. metal flashing is which
bituminous materials are to be adhered shall be primed prior to installation. (8907.0) i
T I
S1 ature of Primary Installer ate
Signature of atmit Holder to
L
i