Loading...
CHECKOFF SHEET MS-2014-01990_0001.tif i 09- 19 -'14 18;56 FROM- Absolute Customs T -141 P0008 {0010 F -054 20019 INTERNATI RESW CODE CITY OF B LAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Peal Inspection ; 21 S I Ixh Street, Blair, NE 68008 Because of limitations caused by the in%asibillty to perform detailed inspeotions which wools not interfere: with reroofing work, please indicate compliance with the following requirements fol Ing this reroofing job. Perrnlk installation Date: f YES NO 'Cite materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code♦ (11907.1) ICE PRO fECT[ON1 INSTAI - LED : An ice barrier thatconsists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least fr om i e eaVe's ed a to a point a least 24 inohas insids the exterior wall line of the building, (11905.2,7.1) q QTURAI_ C01VlP0hl 11tT5 ARF, SOUND The structUrai roof components are capable of supporting the roof covering system and the material and equipment loads that wlli be encountered during installation of the roof covering system• (8907 EXQ STi IN C DVEI NO ' AS El1 OVED: l )csting roof covering was remover for one of the reasons required by section 8007.3 lei i USTEi MET L OP, FLAE01MG Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (1907,5) LA X11111( fIgS�AI_L�,lw3 111 U- P'�RLlt< Flashing shall be reconstrucwd in accordance with approved manufacturer's installation instructlans. Metal flashing to which bituminous materials are to he adhered shall be primed prior to installation. (11907.6) ` _ I t ature of Primary Installer date Signature ll ermit older Date l