Loading...
CHECKOFF SHEET MS-2014-01964_0001.tif i j_ 09- 19 -'14 13;54 FROM- Absolute Customs T -141 F0002/0010 F -054 ' I 2009 INTERNATIONAL RESIDENTIAL CODE C ITY OF BEAD. REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final inspection 218 S 10 S treet, Blair, NE 68008 eeoause of limitations caused by the infeasibility to perform detailed insPectiOns which would trot interfere with reroofing work, please indicato compliance With the following requirsmOl3ts i following this reroofing job, Permit #: Installation Date: " � YES No The materiels and methods of applioation used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) lCE PIpo F INSTALLED An lee barrier that consists of at least tWO layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at leasf from t eave' ed a to a point at least 24 ino sin ide the exterior wall litre of the building. (R905.2.7.1) { STRUC�'i~ PUL COM PONENTS ARE SOUND: The structural roof componenta are capablo of supporting the roof covering system and the material and equipment loads ,. that will be encountered during installation of the roof covering syatern, (8207.2) EXISTING CtJ WF -_RjN Q WAS REiVIQ11ED Existing roof covering was removed for one of the reasons required by section 11907.3 l•IO R t]STI =I) METAL OR FLAS ING Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (8907.5) LAS l INST kLL [t Ply ICI RLY: Flashing shall be reconstructed In accordance with approved manufaoturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be pilmad prior to installation. (R907.6) T D SI.at ' u a pe j ofPdmary lnstallear tat Sign Ure of ermit Holder ate i I