CHECKOFF SHEET MS-2014-01964_0001.tif i
j_
09- 19 -'14 13;54 FROM- Absolute Customs T -141 F0002/0010 F -054
' I
2009 INTERNATIONAL RESIDENTIAL CODE
C ITY OF BEAD. REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
218 S 10 S treet, Blair, NE 68008
eeoause of limitations caused by the infeasibility to perform detailed insPectiOns which would
trot interfere with reroofing work, please indicato compliance With the following requirsmOl3ts
i
following this reroofing job,
Permit #:
Installation Date: " �
YES No
The materiels and methods of applioation used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
lCE PIpo F INSTALLED An lee barrier that consists of at least tWO layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at leasf from t eave' ed a to a point at least 24 ino sin ide the exterior
wall litre of the building. (R905.2.7.1)
{ STRUC�'i~ PUL COM PONENTS ARE SOUND: The structural roof componenta are
capablo of supporting the roof covering system and the material and equipment loads
,. that will be encountered during installation of the roof covering syatern, (8207.2)
EXISTING CtJ WF -_RjN Q WAS REiVIQ11ED Existing roof covering was removed for one
of the reasons required by section 11907.3
l•IO R t]STI =I) METAL OR FLAS ING Existing vent flashing, metal edges, drain
outlets, collars or metal counter flashing were not reinstalled if rusted. (8907.5)
LAS l INST kLL [t Ply ICI RLY: Flashing shall be reconstructed In accordance
with approved manufaoturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be pilmad prior to installation. (R907.6)
T
D SI.at ' u a pe j ofPdmary lnstallear tat
Sign Ure of ermit Holder ate
i
I