Loading...
CHECKOFF SHEET MS-2014-01760_0001.tif i Sep 25 14 01:53p Triton Exteriors Inc.q 763 - 684 -1147 p,4 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF FLAIR REROOFING CHECKOFF SHEEN" i Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Bair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followings this reroofing job. Property Address: Contractor or Homeowner (if self) : i Permit #: MS -2014- __1 U0 Installation Date: NO ❑ The materials and methods of application used for recovering or replac[ng the existing roof covering comply with the requirements of the building coda. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of under[ayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are II cap of supporting the roof covering system and the material and equipment [oads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain oufiets, collars or metal counter- flashi,ng were not reinstaIIed if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shalt be reconstructed in accordance with approved manufacturer's installation instructions. Meta[ flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer bate Signature of Permit Holder Uate