Loading...
CHECKOFF SHEET MS-2014-00972_0001.tif i 2009 INTERNATIONAL RESIDENTIAL DOD - r CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S '16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date: 17 , C - I�L_ Y S NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i Q ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of aself- adhering polymer modified bitumen sheet was Installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.23.1) (� STRUCTURAL GOMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) [� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) i i ®. FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which 'turninous materials are to be adhered shall be primed prior to installation. (R907.6) Signa re f Primary Installer Date gna ure of Pe 1 Hold r Date i