CHECKOFF SHEET MS-2014-00970_0001.tif 9 INTERNATIONAL RESIDENTIAL C ODE
200
CITE' OF BLAIR REROOFING CHECKOFF SHE ET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to 'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job. j
Permit M.
i
installation Date:
Y NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
iCE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wail line of the building. (R905.2.7.1)
(� STRUCTURAL_ COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
(� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
i
® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain I
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
❑, FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
b
Sign of Primary nstalle Date j
I
Signature of Per it Holder Date