Loading...
CHECKOFF SHEET MS-2014-00970_0001.tif 9 INTERNATIONAL RESIDENTIAL C ODE 200 CITE' OF BLAIR REROOFING CHECKOFF SHE ET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to 'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. j Permit M. i installation Date: Y NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) iCE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the building. (R905.2.7.1) (� STRUCTURAL_ COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) (� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 i ® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain I outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) ❑, FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) b Sign of Primary nstalle Date j I Signature of Per it Holder Date