Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job,
Property Add ress 0 1
Contractor or Homeowner (if self L`��`'fi'Y1L� -_ !
Permit #: CIS- 2014- 00, 56)
Installation Date:
YES MO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the budding code. (8907.1)
® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are �
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
or the reasons required by section RGD7.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5)
lam, ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
f with approved manu €acturer's installation instructions. Meta[ flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R.907.0)