Loading...
CHECKOFF SHEET MS-2014-00580_0001.tif Sep 2514 01:53p Triton Exteriors Inc.q 763 -684 -1147 p.2 i i INITERNATIONAL RESIDENTIAL COQ CITY OF BL AIR R ROOFING CHECKOFF SHEET Return to Blair City Mall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job, Property Add ress 0 1 Contractor or Homeowner (if self L`��`'fi'Y1L� -_ ! Permit #: CIS- 2014- 00, 56) Installation Date: YES MO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the budding code. (8907.1) ® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are � capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one or the reasons required by section RGD7.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) lam, ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance f with approved manu €acturer's installation instructions. Meta[ flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R.907.0) Signature of Primary Installer Date a� VIC ` S!gnlal of Permit Holder I ftake