CHECKOFF SHEET MS-2014-00411_0001.tif Sep 1514 01;04p First Choice Builders 402 - 504 -9901 p.1
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFIN,G CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
I .
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please Indicate compliance with the following requirements j
following this reroofing job.
Property Address: /1, �9 cW' Az 1311L A-
Contractor or Homeowner (if self)
Permit #: MS- 2014- oo
Installation Date: lP liq
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was Installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall fine of the building. (8905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment bads
that will be encountered during installation of tho roof covering system. (8007.2)
❑ EXISTING COVERING WAS REMOVED: Existin g .. 9 roof covering was removed for one
of the reasons required by section R907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
i
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (12907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous Materials are to be adhered shall be primed priorto installation. (R9073)
Signature Date
ci11 �i� l�
Signaturb of Permit Holder bate
i