Loading...
CHECKOFF SHEET MS-2014-00411_0001.tif Sep 1514 01;04p First Choice Builders 402 - 504 -9901 p.1 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFIN,G CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 I . Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please Indicate compliance with the following requirements j following this reroofing job. Property Address: /1, �9 cW' Az 1311L A- Contractor or Homeowner (if self) Permit #: MS- 2014- oo Installation Date: lP liq YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall fine of the building. (8905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment bads that will be encountered during installation of tho roof covering system. (8007.2) ❑ EXISTING COVERING WAS REMOVED: Existin g .. 9 roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, i drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (12907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous Materials are to be adhered shall be primed priorto installation. (R9073) Signature Date ci11 �i� l� Signaturb of Permit Holder bate i