Loading...
Checkoff Sheet MS-2014-01700_0001.tif i l 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROO FING CHECKOFF T R eturn to Blair Cit �� t Flan prior t® Final l Y p n.apecti ®n 21 S 16 Street, Blair, NE 6800 Because of limitationsi caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements foll,�owing this reroofing job. Property Address: Contractor or Homeowner (if self) Permit #: MS -20'l4 I Installation Gate:` E NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R.907.1) ❑ ICS T , K-CTI O N INSTALLED An ice barrier that consists of at least two layers of underlayment or of a s64- adhering polymer modified bitumen sheet was installed and extends at le ast from the eaygl edge to a point at least 2 in ches iris! de — the exterior wall line of the building, (18905.2.7.1) P i TRUC >`IJ AL_OIVII� ;NE II°� ARE SOUN�J: The struci;ural roof components are capably, Of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) i ❑ -I TINO CC VERINO 'VITA REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ® 1311 N ►' t ISE RUSE EC G." A ORSFiIN Existing vent flashing, metal edges, drain Outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I PLASH INSTALLEI PROMLy: Flashing shall be reconstructed in accordance ! with approved manufacturer's installation instructions. Metal flashing to which bituminous materials aro to be adhered shall be primed prior to installation. (R907.6) Y Signature of Primary Installer• Date 9 Sl ri ure of Permit H f Date Jt i i i