Checkoff Sheet MS-2014-01700_0001.tif i
l
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROO FING CHECKOFF T
R eturn to
Blair Cit ��
t Flan prior t® Final l
Y p n.apecti ®n
21 S 16 Street, Blair, NE 6800
Because of limitationsi caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
foll,�owing this reroofing job.
Property Address:
Contractor or Homeowner (if self)
Permit #: MS -20'l4 I
Installation Gate:`
E NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R.907.1)
❑ ICS T
, K-CTI O N INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a s64- adhering polymer modified bitumen sheet was installed and
extends at le ast from the eaygl edge to a point at least 2 in ches iris! de — the exterior
wall line of the building, (18905.2.7.1)
P
i
TRUC >`IJ AL_OIVII� ;NE II°� ARE SOUN�J: The struci;ural roof components are
capably, Of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2) i
❑ -I TINO CC VERINO 'VITA REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
® 1311 N ►' t ISE RUSE EC G." A ORSFiIN Existing vent flashing, metal edges,
drain Outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
I
PLASH INSTALLEI PROMLy: Flashing shall be reconstructed in accordance !
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials aro to be adhered shall be primed prior to installation. (R907.6)
Y
Signature of Primary
Installer•
Date
9
Sl ri ure of Permit H f Date Jt
i
i
i