Checkoff Sheet MS-2014-01618_0001.tif 3
2009 IN'TERNAwriONAL RESIDENTIAL CODE
C ITY OF BLAIR CHEC T"
R eturn to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the: following requirements
following this reroofing ,fob.
Property Address: ` ,
C ontractor or Homeowner (if self),
Permit #: MS- 2014 -
A
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R.907.1)
I MEDTIO6 IN aL IL. : An ice barrier that consists of at least two layers of
underlayment or of a s6lf- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 2 in ches i - iside the exterior
wall line of the building. (R905.2.7.1)
STRUG TURAL COMpdJNENTS ARE SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment leads
that will be encountered', during installation of the roof covering system. (8907.2)
XISTI CO I RING W,q_;; RE - Q.
Existing roof covering was removed for one
of the reasons required by section R907.3
DID NO T U RUSTEE gk A (�R 1ASRINO; Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907,5)
I -LASHl ( ?, INSTALLEI )PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (R907.6)
(9, aK -
Siggnature of Primary Installer 4 Date
Signature of Permit Holder`` �LJ
Date