Checkoff Sheet MS-2014-01617_0001.tif RES 2009 INTERNATIONAL
CITY OF BLA kEROOFI
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68006
1
Because of limitations caused by the infeasibility to perform detailed inspections which would
no interfere with reroofing work, ('lease indicate compliance with the following requirements
following this reroofing job,
Property Address:
i
Contractor or Homeowner (if self)
Permit #: lVIS- 2 0'14." z> / to / -7
_`. II
Installation Date:
i�
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑
LICE PR O7 C`fI N I lS 16L - ED: An ice barrier that consists of at least two layers of
�a
underlayment or of a self-adhering polymer modified bitumen sheet w installed and
extends at least fre mth eavets eel q, to a point at least 24 inches inside the exterior
wail lime of the building, ;(R905.21.1)
❑ STRUOTU AL OMP(
)NE'N TS A RE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WA REMOVED Existing roof covering was removed for one
of the reasons required by section R907.3
k
❑ DID NOT U RUSTE (METAL OR FL ASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) i
F'LASHIING INSTA,L.LEI ' (PERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials aro to be adhered shall be primed prior to installation. (R907.6)
Signature of Primary Installer Date
��
Srgnetrare of Permit Holder
1
Date