Loading...
Checkoff Sheet MS-2014-01610_0001.tif 009 INT RES IDENTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 21 S ' I 6th street,. Blair, NE 65008 4 i Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: -®L Installation Date: 1 YES NO �� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R90M) (� ICE p POT EGTIO I INSTALLED: An ice barrier that consists of at least two layers bf of mer modified bitumen sheet was installed and underlayment or of a self - adhering poly extends at (east from the eaye's edge :44 inches inside the exterior to a point at least wall line of the building. (R905.2.7.1) ri ( STRUCTURAL. COMPONENTS ARE SOUND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 [� NO RUSTED METAL OR FLASHIN Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (R907.5) �. FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance j with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i rr ary Installer Date Signatur a of Permit der Date