Checkoff Sheet MS-2014-01610_0001.tif 009 INT
RES IDENTIAL CODE -
CITY OF BLAIR REROOFING CHECKOFF
SHEET
Return to Blair City Hall prior to Final Inspection
21 S ' I 6th street,. Blair, NE 65008 4
i
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: -®L
Installation Date: 1
YES NO
�� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R90M)
(� ICE p POT EGTIO I INSTALLED: An ice barrier that consists of at least two layers bf
of mer modified bitumen sheet was installed and
underlayment or of a self - adhering poly
extends at (east from the eaye's edge :44 inches inside the exterior
to a point at least
wall line of the building. (R905.2.7.1)
ri ( STRUCTURAL. COMPONENTS ARE SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
[� NO RUSTED METAL OR FLASHIN Existing vent flashing, metal edges, drain
outlets, collars or metal counter flashing were not reinstalled if rusted. (R907.5)
�. FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance j
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
i rr ary Installer Date
Signatur
a of Permit der Date