Loading...
Checkoff Sheet MS-2014-01293_0001.tif AW) L-�A 2009 INTERNATIONAL RESIDENTIAL C01)E CITY OF BLAIR REROOFING CHECKOFF SHEET' Return to Blair City Hall prior to Final Inspection 218 S 16 Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: _ 01 Fll\/ 611 N Contractor or Homeowner (if self) Llt E�K T?_R Permit #: Installation Date; YES No n The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE -PR0-7g-�CTI0N IN TALL D: An ice barrier that consists of at least two layers o f 3 underlayment or of a self- adhering polymer modified bitumen sheet was instaLlgLo and extends at eav least from th ,9��h _— ed to a point at _least 24 lrLqjhes ir si i wall line of the building, (R905,,7.1) _L dq the ()xt( o 2 r STRUCTU CoMF VIPQNENTS -__ARE SOUND: The structural roof components are capable Of Supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (R907.2) BI LING COVERING N/ „ RE , 4 i rMOVEU. Existing roof covering was removed for one of the reasons required by section R907.3 2r)10 NaT L)SE RUSTE ) METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907 .5) [FLASUN 1-1211� PROPERLY. L NS11A Flashing shall be reconstructed in accordance 11- with approved manufaclurer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation, (R907.6) SGgnaOL re Wofiv�inmary Install-jr—­— Date sJgn of Per Date