Loading...
Checkoff Sheet MS-2014-01292_0001.tif Y RESIDENTIA 2009 INTERNAariONAL CODE I CITY OF BL AIR I CHECKOFF SHEET' Return to Slaair s pity Hall prior t® Final Inspection 218S-16 th Street, BWr, NE 6600EI e Because of limitations caused by the infeasibility to perform detailed inspections which would i Lo t interfere with reroofing work, please indicate compliance with the following requirements foll� owing this reroofing job. tl Prr:)perty Address; i : Contractor or Homeowner (if self) Permit #: MS- 2014. f Installation Date: _ L 3 ti YES NO ' I ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R,907.1) ICE PS'ig CT°iOYV IN ° ALLED Are ice barrier that consists of at least two layers of r underlayment or of a se4f- adhering polymer modified bitumen sheet was installed and t xt ;tad. # least from Lh(e eave's ed e to a point at least 2 4 in ches in side the exterior wall fine of the build ing,(9,'l) ® S I& RAL,_COMPPN N S ARE The structural _ � SOUND: t uctural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTI COVERING Wj REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT IJ SE RUSTEE ME OR FLASHING: Existing vent flashing, metal edges, drain outlel:s, collars or metal counter - flashing were not reinstalled if rusted. (R90 FLASHING INSTALLED P ROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials aro to be adhered shall be primed prior to installation. (R907.6) I Signature of rimary Installer -- Date Signa ure of Permit Holder � Date r �