Checkoff Sheet MS-2014-01292_0001.tif Y
RESIDENTIA 2009 INTERNAariONAL CODE I
CITY OF BL AIR I CHECKOFF SHEET'
Return to Slaair s
pity Hall prior t® Final Inspection
218S-16 th Street, BWr, NE 6600EI
e
Because of limitations caused by the infeasibility to perform detailed inspections which would i
Lo
t interfere with reroofing work, please indicate compliance with the following requirements
foll� owing this reroofing job. tl
Prr:)perty Address;
i
:
Contractor or Homeowner (if self)
Permit #: MS- 2014. f
Installation Date: _ L 3
ti
YES NO
' I
® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R,907.1)
ICE PS'ig CT°iOYV IN ° ALLED Are ice barrier that consists of at least two layers of r
underlayment or of a se4f- adhering polymer modified bitumen sheet was installed and
t xt ;tad. # least from Lh(e eave's ed e to a point at least 2 4 in ches in side the exterior
wall fine of the build ing,(9,'l)
® S I& RAL,_COMPPN N S ARE The structural _ � SOUND: t uctural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTI COVERING Wj REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT IJ SE RUSTEE
ME OR FLASHING: Existing vent flashing, metal edges,
drain outlel:s, collars or metal counter - flashing were not reinstalled if rusted. (R90
FLASHING INSTALLED P ROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials aro to be adhered shall be primed prior to installation. (R907.6)
I
Signature of rimary Installer -- Date
Signa ure of Permit Holder �
Date
r �