Loading...
Checkoff Sheet MS-2014-00992_0001.tif f k i 2009 INTERNA'OnONAL RESIDENTIAL D CITY OF BLA IR REROOFING OFF T" Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 66006 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, i' lease indicate compliance with the = following requirements wi follong this reroofing job. l Property Address: . c - , V_ Contractor or i fiorveouvrrer (if self) " _„ d 7 hermit m, MS- 20'l4­ Installation Date: ES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) 3 ICE F T GT'I N IN "TALL.ED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer mortified bitumen sheet was installed and extends at:least from the ea ve's ed�te to a point at lea 4 inches inside the exterior wall line of the build (�� R905.2.7.1) TRLf U RAL t I l � I IT- ARE S; QUND, The structured roof components are r capable of upporting the roof covering 1,� stem and the material and equipment loads that will be encountered,during installation of the roof covering system. (R907,2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one .__ of the reasons required by section R907.3 ❑ DID NO T U RUSTECI METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R90 ❑ FLASH I14STALLE I�RG : F shall be reconstructed in accordance Flas ' with approved manufactwer installation instructions. Metal flashing to which bituminous materials are ; to be adhered shall be primed prior to installation. (8907.6) Sigrrature of Primary Installer Date Sig ra re of permit Holder — — Date i F ,iii