Checkoff Sheet MS-2014-00992_0001.tif f
k i
2009 INTERNA'OnONAL RESIDENTIAL D
CITY OF
BLA IR REROOFING OFF T"
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 66006
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, i' lease indicate compliance with the = following requirements
wi
follong this reroofing job. l
Property Address:
. c - , V_
Contractor or i fiorveouvrrer (if self) " _„ d 7
hermit m, MS- 20'l4
Installation Date:
ES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
3
ICE F T GT'I N IN "TALL.ED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer mortified bitumen sheet was installed and
extends at:least from the ea ve's ed�te to a point at lea 4 inches inside the exterior
wall line of the build (��
R905.2.7.1)
TRLf U RAL t I l � I IT- ARE S; QUND, The structured roof components are r
capable of upporting the roof covering 1,� stem and the material and equipment loads
that will be encountered,during installation of the roof covering system. (R907,2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
.__
of the reasons required by section R907.3
❑ DID NO T U RUSTECI METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R90
❑ FLASH I14STALLE I�RG : F shall be reconstructed in accordance
Flas '
with approved manufactwer installation instructions. Metal flashing to which
bituminous materials are ; to be adhered shall be primed prior to installation. (8907.6)
Sigrrature of Primary Installer Date
Sig ra re of permit Holder — —
Date i
F