Checkoff Sheet MS-2014-00806_0001.tif INT ERNATIONAL I I
CITY OF BLAIR REROOFING F SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Flair, NE 66000
Because of limitations caused by " infeasibility to perform detailed inspections which would
not interfere with reroofing work, lAease indicate compliance with the following requirements
following this reroofing job.
Property Address: ), t j f t
Contractor or Homeowner (if self) j_
Permit : S -201 -,,
Installation Date:_,
YE NO
I
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE P tQLr - , -(jT'ION IN� , , , , 'j -Iu, LED: An ice barrier that consists of at least two layer's of
underlayment or of a se f- adhering polyrner modified bitumerd sheet was installed and
extends a t least from the eava's ecI e to a point at least 2 4 � ches inside the exterior
�__.._ ,
wall line of the building, .(R905.2.7;1)
❑
STRUC COMP( NENT� S ARE SOUND: The structural roof components are
z
capable of supporting the roof covering system and the material and equipment loads
that will be encountered; during installation of the roof covering system. (R907.2)
❑ EXISTI C OVERING Ul�A,
j REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
I
❑ DID NO T U RUSTEC GUIETAL OR PLASHING: Existing vent flashing, metal edges,
drain outlets, collars or itnetal counter - flashing were not reinstalled if rusted. (R907,5)
® FLA�IJ N NSTA,LLEt P� PERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
E
bituminous materials area to be adhered shall be primed prior to installation. (R907.6)
s
Signature of rimary Installer °-
Date
Sin u &e of Permlt Holder' l
o dr;r Date