Loading...
Checkoff Sheet MS-2014-00806_0001.tif INT ERNATIONAL I I CITY OF BLAIR REROOFING F SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Flair, NE 66000 Because of limitations caused by " infeasibility to perform detailed inspections which would not interfere with reroofing work, lAease indicate compliance with the following requirements following this reroofing job. Property Address: ), t j f t Contractor or Homeowner (if self) j_ Permit : S -201 -,, Installation Date:_, YE NO I ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE P tQLr - , -(jT'ION IN� , , , , 'j -Iu, LED: An ice barrier that consists of at least two layer's of underlayment or of a se f- adhering polyrner modified bitumerd sheet was installed and extends a t least from the eava's ecI e to a point at least 2 4 � ches inside the exterior �__.._ , wall line of the building, .(R905.2.7;1) ❑ STRUC COMP( NENT� S ARE SOUND: The structural roof components are z capable of supporting the roof covering system and the material and equipment loads that will be encountered; during installation of the roof covering system. (R907.2) ❑ EXISTI C OVERING Ul�A, j REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I ❑ DID NO T U RUSTEC GUIETAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or itnetal counter - flashing were not reinstalled if rusted. (R907,5) ® FLA�IJ N NSTA,LLEt P� PERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which E bituminous materials area to be adhered shall be primed prior to installation. (R907.6) s Signature of rimary Installer °- Date Sin u &e of Permlt Holder' l o dr;r Date