Loading...
Checkoff Sheet MS-2014-00791_0001.tif i 2009 INTERNATIONAL M TI CODE CITY OF BLAIR. REROOFING CHECKOFF SHEET to Blair city Hall prior to Final Inspection Return Y i 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would mpliance with the following requirements not interfere with reroofing work, please indicate co following this reroofing job. / Permit #: Installation Date S NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: Thestructural teriai and equipment loads capable of supporting the roof covering system and that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) i FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance i with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) ` Date Signature of Primary Installer 41 Date & Permit Hol er i