Loading...
Checkoff Sheet MS-2014-00575_0001.tif i f i i a " F 2009 INTERNAOnONAL RESIDENTIAL CODE C ITY OF BLAIR REROOFING C FF T Return to Blair City Mall prior to Final In;opection 218 S 16' Street Blair, NE 6800E Because of limitations caused by the infeasibility to perform detailed inspections which would ELM with reroofing work, please indicate compliance with the following requirements ' o (gwin this reroofing job, � Property Address: etc L-.1 C73 tA Co ntractor or Homeowner if self 3 Permit #: - 2014 -- 00 5 °7 Installation bate: YES NO i The materials and methods of application used for recovering or replacing the existing roof covering comply wath the requirements of the building code. (R.907,1) lE Pr wig ig T IN INS l�l : An ir,e barrier that consists of at least two layer;: of underlayment or of a self- adhering polymer modified bitumen sheet was installe and extends t leash from h +eve' 7 e' e to apoint at least 2 4 in ches inside the exterior wall ling of the building, (R905..2.7,1) 4 r S TRUC TU RAL COMP t'�E N TS ARE SOUND: The structural roof components are l capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) y ® X N coil RlNG W, Aj R Existing roof covering was removed for one of the reasons required by section R907.3 i DID N OT U RUSTED TPI E r+L UP, PLASHING: Existing Vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R90"7.5) FLASH IIVG INSTALLE P RP - Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are.t to be adhered shall be primed prior to installation. (R907.6) : Signat re of Primary installer Date Sin _.._._._. g tune of Permit Hol e d r Date I x x