2009 INTERNAOnONAL RESIDENTIAL CODE
C ITY OF BLAIR REROOFING C FF T
Return to Blair City Mall prior to Final In;opection
218 S 16' Street Blair, NE 6800E
Because of limitations caused by the infeasibility to perform detailed inspections which would
ELM with reroofing work, please indicate compliance with the following requirements
' o (gwin this reroofing job, �
Property Address: etc L-.1 C73 tA
Co ntractor or Homeowner if self 3
Permit #: - 2014 -- 00 5 °7
Installation bate:
YES NO
i
The materials and methods of application used for recovering or replacing the existing
roof covering comply wath the requirements of the building code. (R.907,1)
lE Pr
wig
ig T IN INS l�l : An ir,e barrier that consists of at least two layer;: of
underlayment or of a self- adhering polymer modified bitumen sheet was installe and
extends t leash from h +eve' 7 e' e to apoint at least 2 4 in ches inside the exterior
wall ling of the building, (R905..2.7,1) 4
r
S TRUC TU RAL COMP t'�E N TS ARE SOUND: The structural roof components are l
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
y
® X N coil RlNG W, Aj R Existing roof covering was removed for one
of the reasons required by section R907.3
i
DID N OT U RUSTED TPI E r+L UP, PLASHING: Existing Vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R90"7.5)
FLASH IIVG INSTALLE P RP - Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are.t to be adhered shall be primed prior to installation. (R907.6)
:
Signat re of Primary installer
Date
Sin _.._._._.
g tune of Permit Hol e
d r Date