Loading...
Checkoff Sheet MS-2014-01304_0001.tif I I t_ 09- 19 -'14 13;56 FROM- Absolute Customs T -141 F0009/0010 F -054 2009 INTERNATIONAL I TI CODE CITY OF BEAD. REROOFING CHECKOFF SHEET Return to Blair City flail prior to Final inspection ; m s 16 street, Blair, NE 68008 Because of limitations causorl by the Infeasibility to perform datailed inspections which would not interfere with reroofing work, please Indicate eompliartce with the folloWing requirements following_ this reroofing job. Permit #: c Installation Mate: YES NO The materials and methods ai: application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ICI_ PROTF.CTION INST ALLED , An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends t least fro the cave's ed to a point at bast 24 i nche in side the exterior wall line of the building. (R906.2.7.1) BTRUCTU L - .0IMPOMENTS ARE SOUND: The structural roof components capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering systern. (8907.2) Xl Tilri OOVERINC VVAS R�[VEOVED: Existing roof covering was removed for one of the reasons required by section 8907,3 NO RUS METAL L Ql�'.1*LASHINGr rxisting vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (89137.5) ` FLASHING I NSTALL B PR P RLY: Flashing shall be reconstructed in accordancs with approved manufacturer'a installation instructions. Metal flashing to which bituminous materials are to be adhered shall lie primed prior to installation. (ROOT -6) — 0 OA A n .... i ature of Primary nstaller DU ignature of Date P. mit Holder � i I