Checkoff Sheet MS-2014-00282_0001.tif i
Sep 22 14 09;20a The Roofing Moose 402 - 763 -8382 p2
1 0 4"009" 1 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
I
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68 008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: a !L4
Contractor or Homeowner of self)
Permit #: WIS -201 4w ' A,
Installation Date: - c2q ' --
i
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED An ice barrier that odnsists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at feast from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND The structural roof components are
capable of supporting the roof covering system and the material and equipment [oads
that will be encountered during installation of the roof covering system. (8907.2)
f l4 EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
Ise
FU C3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted_ (R907.5)
Q FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation: instructions. Meta[ flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
(9,0
Signature ary Installer Date
Signature o it Holder Date