Loading...
Checkoff Sheet MS-2014-00282_0001.tif i Sep 22 14 09;20a The Roofing Moose 402 - 763 -8382 p2 1 0 4"009" 1 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET I Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68 008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: a !L4 Contractor or Homeowner of self) Permit #: WIS -201 4w ' A, Installation Date: - c2q ' -- i YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED An ice barrier that odnsists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at feast from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND The structural roof components are capable of supporting the roof covering system and the material and equipment [oads that will be encountered during installation of the roof covering system. (8907.2) f l4 EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 Ise FU C3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted_ (R907.5) Q FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation: instructions. Meta[ flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) (9,0 Signature ary Installer Date Signature o it Holder Date