Check off Sheet (6) 2009 INTERNA
RES
CITY OF BLAIR REROOFING CHECKOFF SHEET I-
Return to Blair City Half prior to Final Inspection
218 S '16 th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'pe e ailed f ollowing in spection s whi would
not interfere with reroofing work, please indicate
followin this reroofing job.
Permit #: -- ---- -T
Installation Date: tN
YES NO
d' The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
y (� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The
th m material and equipment loads
capable of supporting the roof covering system a
that will be encountered during installation of the roof covering system. (R907.2)
` ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
' ® NO RUSTED METAL OR FLASHING. Existing vent flashing, m etal e dges,
5) drai
outlets, collars or metal counter - flashing were not reinstalled if r usted.
t [� FLASHING INSTALLED PROPERLY: Flashing shall be reco nstru ct ed lashin in accordance
with approved manufacturer's installation instructions. Meta g to
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signatur of Primary Installer Da
i
Date'
Signatufb of Permit Holder
i