Loading...
Check off Sheet (6) 2009 INTERNA RES CITY OF BLAIR REROOFING CHECKOFF SHEET I- Return to Blair City Half prior to Final Inspection 218 S '16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'pe e ailed f ollowing in spection s whi would not interfere with reroofing work, please indicate followin this reroofing job. Permit #: -- ---- -T Installation Date: tN YES NO d' The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) y (� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The th m material and equipment loads capable of supporting the roof covering system a that will be encountered during installation of the roof covering system. (R907.2) ` ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ' ® NO RUSTED METAL OR FLASHING. Existing vent flashing, m etal e dges, 5) drai outlets, collars or metal counter - flashing were not reinstalled if r usted. t [� FLASHING INSTALLED PROPERLY: Flashing shall be reco nstru ct ed lashin in accordance with approved manufacturer's installation instructions. Meta g to bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signatur of Primary Installer Da i Date' Signatufb of Permit Holder i