Check off Sheet (3) 09/19/2014 FRI 10:10 FAX 0001/002
2009 INTERNATIONAL RESIDENTIAL C4
CITY OF BLAIR REROOFING CHECKOFF SKEET
Return to Blair City Hall prior to Final Inspection r
. 218S16 th Street, Blair, NE 68008�� y��s
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the fallowing requirements
foliowinn this reroofing job.
Property Address• Zlz
Contractor or Homeowner (if self) :
Permim MS-2014- J 0 6 S
Installation Date:
YE NO
Y9
Y . ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to -a point at least 24 inches inside the exterior
wall line of the building, (R905.2.7.1)
' L'7 STRUCTURAL COMPONENTS ARE SOUND'. The structural roof components are
capable of supporting the roof covering systerri and the material and equipment loads
that will be encountered wring installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
(� DID NOT USE RUSTED METAL. OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
I� FLASHING INSTALLED PROPERLY- 'Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous M aterials are to be adhered shall be primed prior to installation, (R907.6)
Sign t re of Primary In al r Date
ignature of Permit er Date