Loading...
Check off Sheet i 0091NT TI . L RESIDENTIAL C CITY OF BLAIR REROOFING CHECKOFF SHEE Return to Blair City Hall* prior to Final Inspection 2'18 S 16 Street, Blair, NE 68008 I Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, Tease indicate compliance with the following requirements following this reroofing job. Permit # :- I Installation Date: t YES NO (� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) ICE PROTE CTION INSTALLED: An ice barrier that consists of at least two layers of [� � underiayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edg to a point at least 24 inches Inside the exterior wall line of the building. (R905.2.7.1) [� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are ment capable of supporting the roof covering system and the mate a nd 907 z)loads that will be encountered during installation of the roof c Y U EXISTING COVERI[�G WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 (� ®` NO RUSTED METAL OR FLASHING: Existing vent ifnrusted e (R907.5) drai outlets, collars or metal counter - flashing were not reinstalled ® [=LASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approve manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of Primary Installer i ate Signature of Permit Holder ` i