Loading...
Checkoff Sheet MS-2014-01246_0001.tif 09/18(2014 14:36 4025545809 HSOONT RAGE 01/01 INTERNA TIONAL RESIDENTIAL C ITY OF 13LAIR F FI CHECKOFF SHEET � Return to B lai r City Hall p rior t o Fi na l Inspection 21 '1 Street, Nair, NE 88008 Because of limitations caused by the infeasibility to perform detailed inspections which would r� interfere with reroofing work, please indicate aompliance with the following requirements following this reroofing job. Property Address; ' r r orh�rac# or Homeowner (if self ; � `� ��,� `�? C� / � A LL —cz • Permit #; IIB -20 1_2- Installation Date: f -z� YES NO _ The materials and methods of application used for recovering or replacing the existing roof covering gornply with the requirements of the building code. (R907,1) ICE PROtECTION INSTALLED. An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen shut was installed and Extends at least from the eave's edge to - point at least 24 inches inside the exterior j • wall line of the building. (R905.2.7.1) I ' STRUCTURAL COMPONENTS ARE SOIyiN : The structural roof components are r. capable cf supporting the roof covering systern and the material and equipment loads that will be encountered wring installation of the roof covering system, (R907,2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I DID NOT USE RUS METAL! OR FLASHING; Existing vent flashing, metal edges, drain outlets, collArs or metal counter flashing were not reinstalled if rusfied. (11907.) I F INSTALLED PRO Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which I. bituminous materials are to be adhered shall be primed prior to installation. (R907,0), 31gn tur f Prim ry Installer ffate 3lgnatrare of Permit W der bate