Loading...
2279.tif , E ATI 2009 INTERNrIt a UNAL OR"ES"hUDEN"TIAL CODE - C OF BLAIRREROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 18 Street, Blair, NE 68008 i t Because of limitations cawed by the infeasibility to perform detailed Inspections which would not Interfere with reroofing w ork, please Indicate compliance with the following requirements following this reroofing j ob. Permit M �. ,� 9 I Installation Gate.. 3 S No A The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) ICI; PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self polymer modified bitumen sheet was installed and extends at least from the eaves edge to a point at l east 24 inches inside the exterior wall line of the building. (R945.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the r oof covering system and the material and equipment loads .., that will be encountered during installation of the roof covering system. (8907.2) 3 EXISTING G0VERtN WAS REM - OSID. Existing roof covering was removed for one of the reasons required by section R997.3 NO RUSTED MET FD FLASHING: Existing vent flashing, metal edges, drain � outlets, collars or metal counter: flashing were not reinstalled if rusted. (R9v7.5) 3 ' FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved 'manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prier to installation. (R907.6) , f Signature of Primary Installer D ata �°° r Slgnattr of F'errnit Holder Dote