CITY OF BLAIR REROOFING CHECKOFF SHEET
i
Return to B lair City Tall prior to Final inspection
218 S 16 Street, Blair, NE 68008
Because of limitations cawed by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work, Tease indicate compliance with the following requirements
following this reroofing job.
09 C> 0'2 7
Perm It
Installation Date. -
f
YES NO
a The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two l ay ers of
polymer modified bitumen sheet was instatled and
undarlaymer f or of aself- adhering
extends at least from the cave's edge to a point at least 24 inches inside the exterior
wall fine of the building. (R906.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND; The structural roof components are
capable of supporting the roof covering system and the material and equipment toads
that will be encountered during installation of the roof covering system. (R907.2)
f
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one �
of the reasons required by section 8907.6
I
NO RUSTED METAL OR FLASHING Existing vent flashing, metal edges, drain I
outlets, collars or meted counter-flashing were not reinstalled if rusted, {Rg07.5} I
' 1
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
rrvith approved manufacturer's installation instructions. Metal Bashing to which
bituminous materials are to be adhered shall be primed prior to installation, (R907.6)
Sig rirnary installer pate