Loading...
2277.tif I ' k 2009 INTERNATIONAL RES CITY OF BLAIR REROOFING CHECKOFF SHEET i Return to B lair City Tall prior to Final inspection 218 S 16 Street, Blair, NE 68008 Because of limitations cawed by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, Tease indicate compliance with the following requirements following this reroofing job. 09 C> 0'2 7 Perm It Installation Date. - f YES NO a The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two l ay ers of polymer modified bitumen sheet was instatled and undarlaymer f or of aself- adhering extends at least from the cave's edge to a point at least 24 inches inside the exterior wall fine of the building. (R906.2.7.1) STRUCTURAL COMPONENTS ARE SOUND; The structural roof components are capable of supporting the roof covering system and the material and equipment toads that will be encountered during installation of the roof covering system. (R907.2) f EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one � of the reasons required by section 8907.6 I NO RUSTED METAL OR FLASHING Existing vent flashing, metal edges, drain I outlets, collars or meted counter-flashing were not reinstalled if rusted, {Rg07.5} I ' 1 FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance rrvith approved manufacturer's installation instructions. Metal Bashing to which bituminous materials are to be adhered shall be primed prior to installation, (R907.6) Sig rirnary installer pate Signature of PerrOhloNder Date j t