Loading...
1811.tif i E i 2009 INTERNATIONAL RESIDENTtAL CODE - CITY O BLAIR REROOFING CHECKOFF SKEET Return to Blamw city Hall prior to Final lnspection , 218 S 1 6 th street, Blab, NE 6800. Because of limitations caused by the infeasibility to'perf'orm detailed inspections which would not interfere with reroofing work, Tease indicate compliance vdth the following requirements following _ this raroofng job. . M FerCnit #. el Installation Dats. j YES NO The mateetals and methods of application used for recovering or replacing the existing roof . covering comply with the requirements of the building code. (R9Q A) [CE PROTECTION INSTALLED: An ice barrier that consists of at least two lagers of underlayrnent or of a self-adhering polymer mod'ried bitumen sheet was installed and extends at lead frorn the eave's ed a to a paint at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL GOMPO :'The structural roof components are capable 6f supporting the roof covering system and the material and equipment loads that will he encountered during installation of the roof covering system. (1907.2) r=XI8T114G COVER NG WAS PEMOVED; Existing roof covering was removed for one of the reasons required by seefion 8907.3 NQ RUSTEQ METAL OR FLASHING= Existing ventfilashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which biturninous materials are to be adhered shall be pruned prior to installation. (R907-6) Signature of Primary Installer Date 4 4 Signature of Permit Holder O d dLV 0t,L LL deS i i