Loading...
1773.tif i I i 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF BLAIR RE ROOFING CHECKOFF SHEEN` Return to Blair City Hall peior to Final inspection . 10 516-1h Street, Bair, NE 6$008 Because of limitations causes[ by the infeasibility to'perforrn detailed Inspections whlclt would no A interfere with reroofing work, please indicate cornpl €ante with the following requirements following this reroofing join. � RerrniM Installation Hate: YESZWO The materials and methods of application used for recovering or replacing the existing roof covering comply Frith the requirements of the building code. (R907.1) ICE ppOTF_BTION INSTALLED An ice barrier that consists of at least two lagers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed a to a point at least 24 inches inside the exterior wall lime of the building. (R905.2.7.1) STRUCTUML Ct}IVlPON TS ARE — SO UNb: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that w411 be encountered daring installation of the roof covering system. (R907.2) EXISTING C€) lERII�G 1tt}'AS REI�ll0lfl~Q. Existing roof covering was removed for one of the reasons required �y section R907.3 NCB RUSTED METAL OR PLASHIN G: Existing vent flashing, metal edges, drain outlets, collars or metal counfar flashing were not reinstalled if rusted. {R907.5) / 6 FLAS14ING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which b[tumin ©us materials are to tea adhered shall be primed prior to installatlon. (RO07.5) - Signature of Primary Installer Date Signature of Permit Holder a e I z -d d9 10 ti � L L deS C i