Loading...
1550 (4).tif 2009 INTERNATIONAL RESIDEN CITY OF t BLA E Return to Blair City Nall prior to Final Inspection 21 8 S 1 6th Street, Blair, NE 68488 Because of limitations caused by the infeasibility to perform detailed inspections which would n ot interfere with reroofing work, please indicate compliance with the f Ilow`n requirements f this rer oofing job. Property Address: I V 27 Contractor or Homeowner if self - ���.�• S Permit #: M S-2014_ �A SSD— Installation Date: YE NO The materials and methods of application used for recovering or replacing the existing p 9 9 roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayrnent or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed e to .a point at least 24 Inches inside the exterior wall line of the building. (R9Q5,2.7.1) ' d S TRUCTURAL COMPONENTS . � t AIDE SOUND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) XISTING COVERING WAS REMOVED: Existing roof coverin g was removed for one .. of the reasons required by section 8907.3 DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) PLASHING INSTALLED PROPERLY:' Flashing shall be reconstructed i accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907,0) Signature of Primary installer (( Date ` �.. 'gnature of Permit older pate