Loading...
888 (2).tif i 2 009 INTER COD ' CITY OF BLAIR REROOFING CHECKOFF SH 1 Return to Blair Cit Hall prior to Final Inspection 218 S 16 Street, flair, NE 65008 • S Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing worst, please indicate compliance with the following requirements fallowing this reroofing job. ; Property Address: /_ Contracto r or Homeowner if s el � �-� L 12A_ , ? 1J t � Permit #. MS _ Installation Date; YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R9O7.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and dxtends at least from the eave's edge to -a point at least 24 inches inside the exterior thrall line of the building. (8996.2.7.1) STRUCTURAL COMPONENTS ARE SQUID: The structural roof componen are r capable of supporting the roof covering system. and the material and equipment loads that will be encountered during installation of the root' covering system. (R997.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed far one f of the reasons required by section 8997.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing ware not reinstalled if rusted. (R997.5) f PLASHING INSTALLED PROPERLY:' i'Iashing shall be reconstructed in accordance ' with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.B) Signature o Primary Installer Date Signature of hermit Holder date £•d d8 1.0tr1. i i, deS I I