695.tif j
OCT -22 -2008 23:39 Frog: Ta s4024 6 4374 p•��1
R NNW
2009IMERNAT
CITY OF BLAIR REROOFIN.G CHECKOFF SKEET
Return to B lair City ball prier, to ,final inspection �
18 6 1Street, Blair, NE 68008
Bacauso of limitations caused by the Infeasibility to perform datailed Inepootions which would
not interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing job.
OaL
Prop erty Address: 0 �LQ � -J, C6ntractor car H meownor 11 Self} : ` 1 � � C
Permit #: MS-201
histallation gate;
N0
I
The materials and methods of app lication Lined for recovering or re p l acing ilie exi -sting
roof covering qo mply with the requirements oftho building code. (R907.1)
ICE PR&ECTlgn INSTA An ioe barrier that consists of at least two layers of
underlaymant or of a self . polymer mudi ed bitumen sheetwasi installed and
extends at least from the eayo% odcg . to a print at least 24 Inches ' side the exterior
wall line of the building. (R905,27,I)
I S TRUCTURAL COMPONENTS_ARE _SOuRM Tho structural roof comporients are
capable of supporting they roof covering ey6tem and the material and equipment laadt
that will be encountered during installation of the roof covering system, (11907,2)
E lSTINQ QPV ERIN WAS REMi� � Existing roof coveting was rernoviad for one
of the reasons r equired by suction R907.1- , -- ._ 1.1 -
did No'r u RUSTED METAL 0R S INN: Existing ven #.flashing, metti edg ,
drain outlets; collars or rmetal counter -TIA ping, were not rein stalled If rusted. (IR90; .5)
FLASHING I NSTALLED PROP Y Fl ashing shall be reconstructed in accordance
vwit me 's lnstallation instructions. Metal flashing to which
bitumirious materials are to adhered shall ho primed prier to installation. (R907.6)
14nature of Prim ' l stallar Date
�natrare of l +�ldr Date
i
i