Checkoff Sheet MS-2014-01899_0001 (2).tif i
Sep 15 2014 3:13PM HP LRSERJET FAX 4028964152 page 1
coo
I
T
W C1 Half Priov to Final InspeAlan
m to IBI*I NE OWN
21,g ebut, Blair
cause i 1�3t' lbilltll to'paeorm awlsd inspeattons wh l�rsm ta
Bemuse of limier intilc� coropli4nas with tha req
Wtlydorkre itl"OOMQ oo�vl
.fftts mmongl0b.
Permit c
ktstallatlon
ND lacing the existing )KO The materials and Tathods of application used for recovering or re p
code• {8907.1}
roof dwering comply whh- the requirements of the - building
M log hanier that consists of Ot least two layer and
und�et'layment or o a "V adhe ttg pc t as point bitumen sheet the wdedor
e3cas fr e s .e,�g
waftitg of the bu ing. {R9D6.2.7.1}
'Fhe structural roof components are
stern and the matedsl and equipment loads
e of supPa g tFae roof covering s y
that�itl be enco tsrad during hetailation of the roof covering system. (R907.2)
[ 3 llwtra t:3lafl . 1ltit18 Fidsdn9 roof coveting was removed for one
of tie reasons required by section 8007.3
F Q Exlsting vent flashing, metal edges, drain
oweb, collars 04 metal hunt ®� flashing were not ralnstalled If rusted. ( 11907 - 6 )
i
• Flashing shall be reconstructed in accotdanos to Which
approved manufacium : a inst ort Instru ai e pri -ved Metal flashing lQ an (8901.8)
bk6minous ma *ftls am to be adhered Sh p
q
0 0 -A Dat
;ft ynature to of Pritnary installer;
mate
of : Hot r
i
i
i