Checkoff Sheet MS-2014-01185_0001.tif i
09116/2014 17:55 7790112 GOEDEN CONSTRUCTION PAGE 01
2009 W"TERNAT10 R"'ESIDEN CODE
CITY OF I. REROOFING CHECKOFF SHE ET
Return to Blair Clay Hall prier t6 Fi nial Inspection
218 18 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not Interfere with reroofing work, please Indicate compliance with the following requirements
foll wing this reroofing job,
Property Address: c "l t.1
Contractor or Homeowner (if self) ; F 7 6¢"
Permit : MS -2014-
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PFIttpCTI(7N (NTALLPp An ice battler that consists of at feast two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the nave's edge toe point —at-least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
�® IRUCTUML COMPONENTS ARE SOUND: The structural roof components are f
capable of supporting the roof covering systerri and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED, roof covering was removed for one
of the reasons required by section P.907.3
Dii NQT US SUS TED IV(1 =`fAL OR FLASHING. Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907,5)
FLASHING INSTA PROPERLY: dashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prier to installation. (R907,6)
4 5 — ALO
S' re of Prim Installer bate
SI a re of Permit Holder p to
r