Loading...
Checkoff Sheet MS-2014-01185_0001.tif i 09116/2014 17:55 7790112 GOEDEN CONSTRUCTION PAGE 01 2009 W"TERNAT10 R"'ESIDEN CODE CITY OF I. REROOFING CHECKOFF SHE ET Return to Blair Clay Hall prier t6 Fi nial Inspection 218 18 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not Interfere with reroofing work, please Indicate compliance with the following requirements foll wing this reroofing job, Property Address: c "l t.1 Contractor or Homeowner (if self) ; F 7 6¢" Permit : MS -2014- Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PFIttpCTI(7N (NTALLPp An ice battler that consists of at feast two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the nave's edge toe point —at-least 24 inches inside the exterior wall line of the building. (R905.2.7.1) �® IRUCTUML COMPONENTS ARE SOUND: The structural roof components are f capable of supporting the roof covering systerri and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED, roof covering was removed for one of the reasons required by section P.907.3 Dii NQT US SUS TED IV(1 =`fAL OR FLASHING. Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907,5) FLASHING INSTA PROPERLY: dashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prier to installation. (R907,6) 4 5 — ALO S' re of Prim Installer bate SI a re of Permit Holder p to r