Loading...
Checkoff Sheet MS-2014-01166_0001.tif ......... . 20 09 INTERNATIONAL I L CODE CITY OF BLAIR REROOFING CHECKOFF SHEET i Return to Blair City Hall prior to Final Inspection i 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) [� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at I east from the eave's ed e to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) Q STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 i { NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) im i PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance I with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Date §Ioature Primary nstaller Date S ure o ermit Holder h I I