Checkoff Sheet MS-2014-01166_0001.tif ......... .
20 09 INTERNATIONAL I L CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
i
Return to Blair City Hall prior to Final Inspection
i
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #:
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
[� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at I
east from the eave's ed e to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
Q STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system, (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
i
{ NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
im i
PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
I
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Date
§Ioature Primary nstaller
Date
S ure o ermit Holder