Loading...
Checkoff Sheet MS-2014-00707_0001.tif Sep 16 2014 3:34PM HP Fax page 2 INTERNATIONA RESIDENTIAL CODE CITY OF BLAIR -REROOFING :CH.ECK6.FF SHEET R eturn to City Hall �prio.r to Final Inspection 2'18 S 16 Street, Blair, NE 68008 Because of limitations caused by the,infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. / Property Address: 2 • ,1 2 - - - Q C� �_ Contractor or Homeowner (If self) Permit m MS-2014 -.� �- Installat. - YE NO The materials and methods of application used fQr recovering or replacing the existing roof covering comply with the requirements of the building code. (11907:1) ICE PROTECTION INSTALLED An lea barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eav&s edge to -a point at least 24 inches inside the exterior Wall line of the - building. (R905.23.1) Q STRUCTURAL COMPONENTS ARE SOUND; The structural roof components are capable of supportin the roof coveri system. and the material and equipment loads that 'wiil be 'en� uhtered 4uring:tristallatiuri af:the ;roof covering (1 907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 6110'NOT USE RUSTED METAL, OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- filashing were not reinstalled If rusted. (8907.5) d . F.L:ASHiNG IN §TALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufactur'er's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be_primed prior to installation. (11907.6) Signature of Priiagry Ins If Date Slgna ure °af Peho Wder' Date