Checkoff Sheet MS-2014-00707_0001.tif Sep 16 2014 3:34PM HP Fax page 2
INTERNATIONA RESIDENTIAL CODE
CITY OF BLAIR -REROOFING :CH.ECK6.FF SHEET
R eturn to City Hall �prio.r to Final Inspection
2'18 S 16 Street, Blair, NE 68008
Because of limitations caused by the,infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job. /
Property Address: 2 • ,1 2 - - - Q C� �_
Contractor or Homeowner (If self)
Permit m MS-2014 -.� �-
Installat. -
YE NO
The materials and methods of application used fQr recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907:1)
ICE PROTECTION INSTALLED An lea barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eav&s edge to -a point at least 24 inches inside the exterior
Wall line of the - building. (R905.23.1)
Q STRUCTURAL COMPONENTS ARE SOUND; The structural roof components are
capable of supportin the roof coveri system. and the material and equipment loads
that 'wiil be 'en� uhtered 4uring:tristallatiuri af:the ;roof covering (1 907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
6110'NOT USE RUSTED METAL, OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter- filashing were not reinstalled If rusted. (8907.5)
d . F.L:ASHiNG IN §TALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufactur'er's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be_primed prior to installation. (11907.6)
Signature of Priiagry Ins If Date
Slgna ure °af Peho Wder' Date