Checkoff Sheet MS-2014-00368_0001.tif 2009 INTERNATIONAL RESIDENTI
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 th Street, Blair, NE 68008 j
. i
Because of limitations caused by the infeasibility to perform detailed inspections which would j
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address:
Contractor or Homeowner (if self) : ! I�'�� �► �� 5 a ,
i
i
Permit #: MS- 2014 - 003
Installation Date:
c�
YES NO
_ ❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of j
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
' y
l
Signature rim ry Ir fialler Date
7
Signature f Permit Holder Date
i
i