Loading...
Checkoff Sheet MS-2014-02517_0001.tif i 2009 INTERNATIONAL RESIPEN COPE CITY OF BLAIR REROOFING CHECK®FF,BHE T Return to Blair. City Hall' priorl<X01 =final Inspection 2'18 S '16 Street, Blait, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followincl this reroofing job. a` �6 � q I Permit #: S Installation Date: YES NO [� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) (� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of / underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the build'mg. (8905.2.7.1) Q STRUCTURAL COMP ONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) E7CISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 rl NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) (� INSTALLED PROPERLY: Flashing shall be reconstructed in accordance FLASHIN G with approved manufacturer's installation instructions. Metal flashing to which tallation. (8907.6) bituminous materials are to be adhered shall be primed prior to ins Signa ure of Primary Installer Date Date lgnature of Permit Hol er i i ! i