Loading...
Checkoff Sheet MS-2014-00554_0001.tif I 2009 INTERNATIONAL RESIDENTI CODE CITY OF BLAIR REROOFING CHECKOFF SHE ET Return to Blair Cit Hall prior to Final Inspection 218 S 16 - Street,., Blair, NE 6800.8 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere With reroofing work; please indicate compliance with the following requirements following this reroofing job. Property Address: fa r Contractor or Homeowner (if self) : cl:- C '; (' ' !� ��i C-4 Permit #: MS -2014- 00 Installation Date: 7 /(, i YES NO / _ ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) I ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system.. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, J drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) _ 1) s2z el Signature of Primary Ins Date • 1 rk ._J Signature of Permit Holder Date