Checkoff Sheet MS-2014-00537_0001.tif l vvv 11r 1 1.,111x1111 1V1r1/'l%LM 11L V11VL 1 1/`�\
CITY OF BLAIR REROOFING CHECKOFF SH
Return to Blair City Hal[ prior to Final Inspection
218 S 16. Street, Blair, NE;68008
Because of limitations caused.by the infeasibility,to perform detailed inspections which would
not interfere with reroofing work; please lnd cate co,mpliancer with the following requirements
following this reroofing job.
i
P roperty Address: 1098 Corey Dr. Blair NE 68008
Contractor or Homeowner (if self) Mr. 8, Mrs. Pinion
Permit #: MS- 2014 -
00537
Installation Date: 8/1/2014
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code, (R907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge >to a point at least 24 inches inside the exterior
wall line of the building. (R905,2.7.1)
' STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
I ❑ PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
8/1/14
Signa ure of Primary Installer Date
AW1144A, / 8/1/14
signatu' 'of Permit Holder Date