Loading...
Checkoff Sheet MS-2014-00537_0001.tif l vvv 11r 1 1.,111x1111 1V1r1/'l%LM 11L V11VL 1 1/`�\ CITY OF BLAIR REROOFING CHECKOFF SH Return to Blair City Hal[ prior to Final Inspection 218 S 16. Street, Blair, NE;68008 Because of limitations caused.by the infeasibility,to perform detailed inspections which would not interfere with reroofing work; please lnd cate co,mpliancer with the following requirements following this reroofing job. i P roperty Address: 1098 Corey Dr. Blair NE 68008 Contractor or Homeowner (if self) Mr. 8, Mrs. Pinion Permit #: MS- 2014 - 00537 Installation Date: 8/1/2014 YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (R907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge >to a point at least 24 inches inside the exterior wall line of the building. (R905,2.7.1) ' STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I ❑ PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) 8/1/14 Signa ure of Primary Installer Date AW1144A, / 8/1/14 signatu' 'of Permit Holder Date