Loading...
Checkoff Sheet MS-2014-00391_0001.tif i Sep, 12. 2014 2,22P No, 0240 P, 1 CI TY a Return to Blair Cltyr Hall prl& to Final lnspectlan 218 '16 S treet, lair,-NE 6888 Because of limitations caused by the Infeasibility to perform detailed Inspections which would not interfere with reroofing work, phase indicate compliance with the following requirements following this reroofing job. Property Address: ,21- v/1- Contractor or Homeowner (if self) : 1 Permit #: MS-2'014 , Installation Date: f YES NO The materials and methods of application used for recovering or replaging the existing roof covering comply with the requirements of the building code. (8907.1) I ICE PR0fECTION INSTALLED An ice barrier that cdnsists of at least two layers of underlaymernt or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior wall line of the building. (11905.27.1) STRUCTURAL COMPONENTS ARE SOUNIY: The structural roof components are capable of supporting the roof covering systern' and the material and equipment loads that will be encountered during installation of the roof covering system, (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 Dill NOT USE RUSTED MBTAL OR FLAStiiNG- Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY, Flashing shall be reconstructsd in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907,0) 4 &gna re of P ri nst er ate re of Permit older Date `� L 1 1