Loading...
Checkoff Sheet MS-2014-00284_0001.tif i IDENTIALCODE �}�°`��, a---�, �=.. P ��[� e U �, 'lFa, r :.. � z .�. "<�'. IS '� "te r � � 3 .� fd.. 00F1 "�_ ,. m $H `- �' . t 1l�-r E u k.efio v n tl7ulw City l W441 -, rf gg �S.`d 8 oh - (�$ e ps I ��� , � , 218 S 1 x Eecause of !imitations caused by the infeasibility to perform detailed 1nap ?c not Int6e kie with toro&inO� di4ohftA6 c0'mptlance'Wlth`trti6 i rig requiremshf$ fio owtm this reroofling job. Property Addreas: , Contractor or i- iomoowner (if self) : ' � G 11�7 1 , Permit #: - 2014 -CGE� Installation pate: -7-vi ai YE !Y NO The materials and methods of application used for recovering or replacing the existing roof covering gomply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge: to a point at least 24 inches inside the exterior wall line of the building. (8905.2,7.1) STRuc - rJRAL COMPONENTS ARE SOUND', The structural roof components are r capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.6 DID NOT USE RUSTED METAL OR.FLASHING Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted, (11907.5) FLA §HIND INSTALLED PROPERLY: Hashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of Primary Installer Date: i Signature of hermit Molder _ Date - --