Loading...
Checkoff Sheet MS-2014-02146_0001.tif i r i CODE 2009 INTERNATIONAL RESIDENTIAL I, CITY F B LAIR REROO CHECKO SHEET Return to Blair City Hall prior to Final Inspection i M S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements follgLAdM this reroofing job. Permit #: i Installation Date: I YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i [� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of aself- adhering polymer modified bitumen sheet was! nstalled and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) i � STRUCTURAL COMPONENTS ARE SOUND: The the m material and equipment loads capable of supporting the roof covering system an that will be encountered during installation of the roof covering system. (R907.2) EXIS EMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.6) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance j with approved manufacturer's installation instructions. Metal flashing to which bitu inous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Pri ry Installer Date Signature of Permit er Dat i