Checkoff Sheet MS-2014-00553_0001.tif j
Jun. 12. 2014 10 :56AM CITY OF GLAIR (402.426.4191) Nc. 3726 P. 2
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKO S H EET
Return to IBlair City Hall prior to Final Inspecti on
218 S 1 Stroat, Flair, NE 68008
Eecouse of limitations caused by the infeasibility to perform detailed Inspections which would
jo_ Interfere with reroofing work, Tease indicate compliance with the fbllowIng requirements
fol lowing this reroofing job. 1 ,
Permit M. z P 00 -y ,
Installation Data:
Y; / C N
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
d ICE PROIECTli: N INSTALLED An ios barrier that consists of at lust two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed and j
extends at least from the e+ave's edge to a point at least 26 inches inside the exterior
wall line bf the building. (R905.2.7.1)
STRUCTURAL COMPONEM ARE SOUND: The structural roof components are
capable of suppoding the roof covering system and the material and equipment IoAds
that will be encountered during Installation of the -roof covering system: (11907.2)
EXISTING COVgRING VITAS REMOVO. Existing roof covering was removed for one
of the reasons required by section 8907.3
i
NO rtUS jEQ METAL 611 PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (11907.5)
I� it S�iING INgjALLrzi) P13,01 RLY; flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to whioh
bituminous materials are to be adhered shall be primed prior to Installation. (11907.6)
, � or 4 Tep
Signature of Primary lffiatallor pate
Signa of Permit R oWer sate