Loading...
Checkoff Sheet MS-2014-00355_0001 (2).tif i Jug, !1. LUl4 1U:�0�+ tt�r ur DLKIN VtVi� 4M +iyil irv. ;tt � j IL Mal AWA NAL RUL.:.SN CODE 2009t INTERNA I U CITY F BLAIR REROOFING HECK sHEET Return to Blair city Mall p to Final insp ection 2'i ie S tr0d, Blair, NE 68008 SecarSd of IlMita+tiona cued by the in aailydlty tO perform detalied inepocoone Which would jl gt interfere with rerooring wort, p1e88e Indieats c;ompllance wit the W10'wtng tequitar"rit' f gji0wi n t rerongb. Permit #,. ,. � i Ins#a lta�don Bate: 12 I YES / 1 - 40 3Y C1 The rnatariais and me nods of application used for recovering or replacing the existing mot covering +amply with the requirements of the buliding code. (R907.1) [ ICE PRttiTECTION INSTALLED: An ice barrier that oonslsts of at least two ors of underiayment or of a self- adhe4og polymer modlfled bitumen ahaet ingglied and extends at Wmat ft e_WWs 9 to a polint in & 01%& the exted" wall line of the building. (8995.2.7.1) Ti U CTURAL D0 PONEN .ARE SOUND The structural roof components are capable of supporting the roof covering system arxi the material and equipment b6da that will be enoounterrad dining installation of the •roof covedrig system. (R907 g&ISTING COVERING 1NG AM R A01fE>r : Existing roof covering was removed for one of the reasons required by section R907.3 , gg=2 METAL BUS I E WIng vent flashing, metal edges, drain outkox, collars or metal counter- ftshing ware not reirnstaitod I rush. (13907. i F: n MM IOU = #!W I'E Flashing shall be reconstruc l In accordance with appr+oved manufacturees lnstallaWn Instuations. Metal flashing to which bkurNnous Materfaie are to be adhered shall be primed prior to installation. (R9117.9) ulgnslture of Prtmary taller date Signature of Pe Ifi abler Date.